Subway Online Monitoring System

 
1. Monitoring Background
The subway is like the "oxygen supplier" of modern cities, providing power and energy for the continuous development of the city. It not only creates wealth and business opportunities, but also leads to changes in the way people live, creating an era of subway cities. In recent years, subway accidents have been occurring continuously, and the total number of casualties has begun to increase significantly, with a clear upward trend in the curve. The accident reflects the inadequacy of safety construction monitoring technology and means, as well as the lack of construction safety management and supervision. The high technological content and high risk in subway construction require strong safety awareness, meticulous safety management, and strict safety supervision to achieve. Subway engineering is largely a project that tests safety management. In order to keep abreast of the construction status of the subway, provide early warning of unexpected accidents, maintain the safety and social stability of subway construction, and prevent tragedies like the Hangzhou subway collapse from happening again, it is urgent to ensure the safety of subway construction.

II. System Overview
Based on the close combination of Internet of Things, cloud computing, big data and other technologies, the innovative application of "Internet plus" in subway monitoring is used to establish a subway automated monitoring platform, form a regional demonstration effect, and open up a new era of automated monitoring of the whole subway line.


III. Main Monitoring Contents
1. Subway foundation pit: top settlement and horizontal displacement of retaining piles (walls), deep horizontal displacement of retaining piles (walls), internal forces of retaining piles (walls), deep horizontal displacement of soil outside the pit, axial force of anchor rods, groundwater level, supporting axial force, and bottom uplift
2. Subway tunnel:
① Shield tunneling method: net clearance convergence of pipe segments, structural stress of pipe segments
② Mining method: arch settlement and convergence, blasting vibration, vertical displacement of central column structure, groundwater level
3. Surrounding risk sources: surface subsidence, pipeline subsidence, building inclination, uneven settlement of buildings, building cracks, bridge pier inclination, uneven settlement of bridge piers

IV. Monitoring Diagram

 
 


V. List of Monitoring Projects

Monitoring itemDevice nameMonitoring itemDevice name
Supporting axial forceStrain gauges, axial force gaugesVertical displacement of building (structure)Static level
Vertical displacement of bridge piers and abutmentsFully automatic robotCracks in buildings (structures)Crack gauge
Bridge pier column inclinationBox type fixed inclinometerVertical displacement of pipe segment structureLaser rangefinder
Bridge crackCrack gaugeNet clearance convergence of pipe segment structureLaser rangefinder
Anchor rod axial forceReinforcement meterVertical displacement of underground pipelinesFully automatic robot
Groundwater levelPore water pressure gaugeVertical displacement of column structureFully automatic robot
 

VI. Monitoring Basis

(1) National Standards for First and Second Class Leveling Surveying (GB12897-2006);

(2) Technical Standard for Monitoring of Building Foundation Pit Engineering (GB50497-2019);

(3) Technical Specification for Building Foundation Pit Support (JGJ 120-2012);

(4) Code for Deformation Measurement of Buildings (JGJ8-2016);

(5) Construction Quality Acceptance Standards for Building Foundation Engineering (GB50202-2018);

(6) Engineering Surveying Standard (GB50026-2020);



7. Implement Functions
1. Construction periodSubway online monitoring: Compare monitoring data with design values to determine whether construction processes and parameters meet expected requirements, anticipate potential hazards in advance, and take necessary engineering measures. Ensure the smooth progress of the project, guarantee construction quality and safety.
2. Online monitoring of subway during operation: To achieve continuous and accurate monitoring of the horizontal and vertical displacement of the section, so as to grasp the deformation characteristics and laws of the section during the operation of the subway, and achieve the purpose of information-based monitoring. When the change value exceeds the preset value, a timely warning can be issued.