首页 > Foundation Pit Monitoring
Foundation Pit Monitoring
Foundation Pit Monitoring

Online monitoring system for foundation pit

1. Monitoring Background
Urban foundation pit excavation has the characteristics of high construction risk and difficulty. At present, the excavation of foundation pits in Shenzhen, Guangzhou, Dongguan and other places is getting deeper and deeper, from the initial four to eight meters to the current maximum depth of more than twenty meters. Due to the complexity of underground soil properties, load conditions, and construction environment, determining design and construction plans solely based on geological survey data and indoor geotechnical test parameters often contains many uncertain factors. Monitoring changes in soil properties, environment, adjacent buildings, and underground facilities caused during the construction process has become an essential part of engineering construction, as well as guiding the eyes for correct construction and a necessary measure to avoid accidents. It is also an information technology. Currently, foundation pit monitoring and engineering design and construction are listed as the three basic elements for ensuring the quality of deep foundation pit engineering.

II. System Overview
Integrating structural health monitoring with IoT architecture, cloud computing, local area network/communication network, and other multi network seamless connection technologies, an intelligent online monitoring system for foundation pits is established to provide real-time monitoring for the construction site. The monitoring system based on cloud computing service center can accommodate monitoring data of tens of thousands of structures such as bridges, tunnels, slopes, etc., forming a regional structural health monitoring platform to achieve unified monitoring and management of all structures within the region.

 
III. Main Monitoring Contents
1. Building foundation pit: top settlement and horizontal displacement of retaining piles (walls), deep horizontal displacement of retaining piles (walls), internal forces of retaining piles (walls), deep horizontal displacement of soil outside the pit, anchor rod axial force, groundwater level, support axial force, and bottom uplift
2. Surrounding risk sources: surface subsidence, pipeline subsidence, building inclination, uneven settlement of buildings, building cracks, bridge pier inclination, uneven settlement of bridge piers

IV. Monitoring Diagram

 
V. List of Monitoring Projects

Monitoring itemDevice name
Supporting axial forceStrain gauges, axial force gauges
Anchor rod axial forceReinforcement meter
Groundwater levelPore water pressure gauge
Vertical displacement of column structureFully automatic robot
Support pile (wall), vertical and horizontal displacement at the top of the slopeFully automatic robot
Horizontal displacement of support pile (wall) bodySeries fixed inclinometer
Surface subsidenceStatic level, total station robot
Vertical displacement of underground pipelinesFully automatic robot
Vertical displacement of buildings (structures)Static level
Cracks in buildings (structures)Crack gauge
Vertical displacement of bridge piers and abutmentsFully automatic robot
Bridge pier column inclinationBox type fixed inclinometer
Bridge cracksCrack gauge
 

 
VI. Monitoring Basis
Technical Specification for Construction Monitoring of Urban Rail Transit Engineering DG/TJ 08-2224-2017Technical Specification for Monitoring of Urban Rail Transit Engineering GB50911-2013Technical Code for Monitoring of Building Foundation Pit Engineering GB50497-2009Technical Standard for Monitoring of Building Excavation Engineering GB 50497-2019

7. Implement Functions
1. 24-hour real-time monitoring: By real-time online monitoring of supporting structures, surface settlement, and inclination of retaining piles, the structural changes of building foundation pits can be grasped in real time.
2. Report push: Real time display and release of monitoring results, and regularly push monitoring reports to users.
3. Multi level warning: Establish a three-level alarm mechanism, and when abnormal data is detected, send SMS or text messages as soon as possibleNotify users in real, broadcast and other forms to achieve comprehensive warning function.
4. Emergency plan handling: Extract corresponding handling methods directly from the expert system, take timely measures such as personnel intervention and road blockade, and eliminate safety hazards in their infancy.
5. Structural trend analysis: Through monitoring data analysis and safety evaluation during the construction period of the foundation pit, structural stability trend analysis can be achieved.
6. Historical data storage: The storage of monitoring data provides an analogy basis for the design and construction of similar projects in the future.