首页 > Excavation Pit Of Hongdu Middle Avenue Station On Nanchang Metro Line 2
Excavation Pit Of Hongdu Middle Avenue Station On Nanchang Metro Line 2
Excavation Pit Of Hongdu Middle Avenue Station On Nanchang Metro Line 2

Foundation pit of Hongdu Middle Avenue Station on Nanchang Metro Line 2

1. Project Background

Hongdu Middle Avenue Station is located at the intersection of Luoyang Road (Shunwai Road) and Hongdu Middle Avenue. The effective platform center mileage of the station is YDK41+717.306, the starting mileage of the station is YDK41+640.306, the ending mileage of the station is YDK41+837.306, the length is 197m, the net width of the main structure of the standard section is 21.3m, and the width of the main structure at the end well is 25.0m. The left and right lines at both ends of the station are connected to the shield tunnel section, and the left and right lines in both directions are the starting point of the shield tunnel. Hongdu Middle Avenue Station is located at the intersection of Luoyang Road (Shunwai Road) and Hongdu Middle Avenue, arranged in an east-west direction along Luoyang Road (Shunwai Road). It is an underground two-level 14m island platform station.

II. Project Design and Implementation

Station route planning map

As a building surrounding the subway, the risk events faced by buildings and pipelines near Xinjia'an Station mainly include overall building tilt, building settlement, environmental impact, ground wall cracking, pipeline cracking, etc. Faced with numerous security risks, a combination of manual and online methods is adopted to monitor potential risk factors and propose targeted solutions. Specifically, as follows:

Monitoring content

 

The main monitoring contents of this plan include supporting axial force, horizontal and vertical displacement of continuous wall top, deep soil horizontal displacement, groundwater level, pore water pressure, surface settlement, building settlement, building tilt monitoring, pipeline monitoring, and vertical displacement of columns.

 

Serial Number

Risk Events

Risk Factors

Consequences

Health monitoring response measures

1

Surrounding environmental impact

The influence of temperature and humidity

Damage to building structures

Temperature and humidity monitoring at critical structural locations

2

Overall tilt of the building

Slant

1、 Unstable soil 2. Foundation pit

Excavation impact

Building collapse

At the four corners of the building and around the core tube

Install settlement monitoring nodes on the columns

3

Building subsidence

1、 Surface subsidence

2、 Column sinking

Under the overall architecture

Sinking, even collapsing

Set up tilt monitoring nodes

 

 

4

 

Ground wall cracking

1、 The opening and closing of the settlement joint is too large

2、 Relative displacement of settlement joint

Too large

 

 

Building deformation

 

 

Crack monitoring of key settlement joints

5

Pipeline cracking

1、 Uneven settlement

2、 Excessive relative displacement

Accumulation of sewage

Intensify monitoring of rainwater and sewage pipes near the foundation pit, andstrengthen monitoring appropriately during the excavation process of the foundation pit

6

Maintain structural damage

Bad

Excessive soil displacement

Excavation damage

Deep support structures for foundation pits and maintenance structures

Displacement monitoring and pore water pressure monitoring

 

III. Function Implementation

System Implementation Function

  1. Automated monitoring: 24-hour real-time monitoring, no need for personnel to enter the construction site multiple times.
  2. Information management: Implement information management of test data, and relevant personnel can log in to Ethernet with different permissions or use their mobile phones to obtain on-site structural safety data and safety assessment information.
  3. Report push: Real time display and release of monitoring results, and regularly push monitoring reports to users.
  4. Multi level warning: When there is abnormal information in the structure, the systemautomatically issues a warning and promptly conveys the information to relevant management personnel through SMS, and prompts the backend to conduct a safety assessment of the current status of the structure in a timely manner.
  5. Structural trend analysis: By comparing rich load effect data and calculation results, the actual state change and development trend of the structure can be obtained, and the safety status of the structure can be understood.
  6. Multiple terminal query methods: Supports different terminal query methods such as mobile phones, iPads, PCs, etc., truly achieving strategic planning and on-site control.