Nanchang Xianghu Tunnel Foundation Pit
Nanchang Xianghu Tunnel Foundation Pit

Nanchang Xianghu Tunnel Foundation Pit

  • ProjectBackground

The Xianghu Tunnel Project in Nanchang City is located in the central part of Xianghu Scenic Area. It is an important component of the east-west trunk road project from Chaoyang Bridge to Jiuzhou Street, Xianghu Tunnel to Guangzhou Road. It is an important passage connecting the east and west banks of Xianghu Lake and a transportation hub connecting Chaoyang New City and the south of the city. This project includes the mainline and ramp sections.

Main line section: This project starts from 165m west of the Ziyu Road intersection on Jiuzhou Street and ends at the level intersection of Yingbin Avenue. The total length of the project is 2.7km, including a buried section of 1725m, and the wiring at the east and west ends is about 600m and 350m respectively

Ramp section: Auxiliary ramps A and B are set up on the south and north sides of the open section of the tunnel between Zhenjun Road and Ziyu Road; Set up right in and right out ramps C and D on the south and north sides of Shiyao Road; Set up auxiliary ramps E and F on both sides of the open section of the tunnel between Shiyao Road and Yingbin Avenue.

  • Project Design and Implementation

During the construction process of open cut foundation pits, the stability of the structure must be ensured to ensure construction safety. At the same time, it is necessary to ensure that the construction does not endanger the safety of surrounding buildings, existing structures, underground pipelines, etc. Therefore, corresponding monitoring and protection measures must be taken during the construction process. The main purpose of monitoring is to:

  1. Understand the deformation of the enclosure structure and evaluate its stability;
  2. During the construction phase, track and measure the settlement of the foundation pit and surrounding strata, groundwater level, deformation of nearby buildings and underground pipelines, and the stress situation of key parts. Compare the observed data with allowable and theoretical values to reflect the construction situation and its impact on the surrounding environment in a timely and reliable manner;
  3. By obtaining comprehensive information on the enclosure structure and surrounding environment during construction, daily construction management can be carried out, and construction techniques can be improved or designs adjusted in a timely manner to achieve good engineering results and protect the surrounding environment. This provides reliable information for optimizing and organizing construction, guiding construction, improving construction technology, and arranging construction progress reasonably, achieving dynamic design and information-based construction;
  4. Accumulate data to provide summary experience and theoretical research for future design and construction improvement, and provide reference for actual measurement data;
  5. Provide technical support for the safety of the surrounding environment and the smooth completion of the project.

 

Construction monitoring and measurement content

For the structural design of the Xianghu Tunnel project, this monitoring plan is divided into two major items:

  1. Monitoring of foundation pit enclosure structure at XK4+780-XK5+025 section.
  2. Stability monitoring of foundation pits in the main line and ramp buried sections.

This plan adopts manual monitoring method for monitoring the retaining structure of the foundation pit in section XK4+780-XK5+025, and real-time online monitoring scheme for monitoring the stability of the foundation pit in the main line and ramp buried sections.

 

Monitoring of excavation enclosure structure K4+780-XK5+025 section: based on the importance level, engineering geological conditions, design support and construction methods of the proposed projectAccording to the design requirements, this project plans to monitor the following items:

  1. Horizontal and vertical displacement of retaining slope top
  2. Ground subsidence
  3. Settlement of surrounding buildings (structures)
  • Implement Function
  1. Online monitoring information query;
  2. Automatically generate monitoring result reports;
  3. Automatically generate monitoring data change process curves;
  4. Automatically generate deformation analysis and prediction curves;
  5. Automatic warning and alarm of security status, using two methods: system information release terminal prompt pre/alarm and mobile SMS alarm;
  6. Self diagnostic function of online monitoring system.