首页 > Nanchang Zhimin Avenue Foundation Pit
相关项目
相关产品
Nanchang Zhimin Avenue Foundation Pit
Nanchang Zhimin Avenue Foundation Pit
 
One  Project Background Introduction
          The tunnel project of this project is the main line of Zhimin Avenue passing through the campus of Jiangxi Agricultural University. The tunnel is divided into four concealed sections and five open sections. The length of the four concealed sections is 115m, and the open sections at the east and west ends are about 193.296m and 230m respectively. The length of the three open sections in the middle is 85m. The structure of the concealed sections of the tunnel is divided into three sections along the longitudinal direction, and each section is divided into three sections, with a maximum section length of 38.5m. The tunnel foundation pit is supported by soil nails and sprayed concrete with hanging nets. Drainage ditches and collection pits are constructed on both sides of the foundation pit, and water level observation wells are set up at the top of the foundation pit as well as precipitation wells in combination with foundation pit monitoring.
 
Two  Engineering difficulties and risk analysis
          There are many unforeseeable factors and high risks in foundation pit support engineering. The primary consideration in design and construction is to ensure the safety of the foundation pit support itself and the surrounding environment. The deepest 10 meters of the foundation pit belongs to the second-class foundation pit. There are buildings on both sides of the red line, and the excavation enclosure structure and surrounding environment should be closely monitored during the construction period. When abnormal situations occur on site, remedial measures should be taken to ensure the stability of the foundation pit and surrounding buildings.

Copyright © 2026 All Rights Reserved 版权所有· 江西飞尚科技有限公司      备案号:赣ICP备13000994号-1     许可证编号:赣B2-20230512
技术支持:
专属客服
专属微信客服