The excavation area is approximately 11206 square meters, with a circumference of 427 meters. The excavation depth of the foundation pit is 14.7-15.7m, and the depth of the collection well elevator shaft is 1.2-3.45m. The enclosure structure adopts underground continuous wall+sandwich mixing pile water stop, combined with three concrete supports, and the safety level of the support structure is level one.
Considering that the foundation pit route of this project is relatively long and there are many monitoring sections, according to the requirements of the "Technical Code for Monitoring of Building Foundation Pit Engineering" (GB50497-2009), our company has optimized the distribution of points based on the site conditions. The types of monitoring required for each section are shown in the table below.

By implementing online monitoring of the above projects and combining with cloud computing platforms, our company has built an online monitoring system for construction of building foundation pits for this project.
The system implements the following functions:
1. Master the comprehensive information of the enclosure structure and the interior of the foundation pit during construction to ensure the safety of construction personnel;
2. Realize real-time monitoring of the settlement of surrounding strata, groundwater level, and nearby buildings, compare the collected data with allowable values, and timely and effectively reflect the construction process and its impact on the surrounding environment;
3. The overall monitoring of the stability and safety of the construction period of building foundation pits provides fundamental guarantees for the subsequent construction of buildings.