首页 > Shenzhen Gongchang Road Foundation Pit Monitoring
Shenzhen Gongchang Road Foundation Pit Monitoring
Shenzhen Gongchang Road Foundation Pit Monitoring

Shenzhen Gongchang Road Foundation Pit Monitoring

  • ProjectBackground

The Gongchang Road Zhongshan University Shenzhen Campus underpass renovation project is located in Xinhu Street, Guangming District, Shenzhen. It starts from the west side of the intersection of Guangqiao Road and Gongchang Road, passes through the scope of Sun Yat sen University, and heads east through the intended land of Science City (Qiangxia Village), ending at the junction of Shenzhen and Dongguan, with a total length of about 3.56km. The underground road is 2.645km long (2.22km closed section and 0.425km open section), constructed according to the standards of a main urban road, with six lanes in both directions and a design speed of 50km/h; The ground road is constructed according to the standard of a living urban main road, with six lanes in both directions and a design speed of 40km/h. The current Gongchang Road is a main urban road with eight lanes in both directions, a red line width of 60m, asphalt pavement, a designed speed of 50km/h, and the existing Zhenmei River on the east side of the road.

  • Project Design and Implementation

 

Excavation monitoring project and content

Serial Number

Monitoring Objectives

Monitoring Content

1

Monitoring of supporting structures

Deep horizontal displacement of pile body, horizontal and vertical displacement of pile top, internal force of pile body

2

Support system monitoring

Steel support axial force, concrete support internal force, support column settlement

3

Water level monitoring

Groundwater level outside the foundation pit

4

Environmental monitoring

Surrounding surface subsidence, settlement and deflection of surrounding buildings, and surface cracks

 

 

(1) Monitoring of horizontal and vertical displacement at the top of the pile: Install monitoring points for horizontal and vertical displacement at the top of the retaining pile (share one monitoring point). The distance between two adjacent monitoring sections along the direction of the line is 20mEach monitoring section is equipped with one monitoring point, for a total of 274 monitoring points.

(2) Monitoring of deep horizontal displacement of pile body: Based on the characteristics of this project, a series of guide wheel fixed inclinometer and inclinometer tube are used to monitor the deep horizontal displacement of the pile body.

(3) Internal stress monitoring of retaining piles: to monitor the steel stress of retaining piles. Take a monitoring section every 25m along the direction of the line, and arrange 3 monitoring points inside the retaining pile of each monitoring section. Each steel bar meter is installed on the steel cage near the inner side of the foundation pit of the retaining pile. Three monitoring points are arranged within a retaining pile based on the number of supports on the monitoring section

(4) Concrete support axial force monitoring: Take a monitoring section every 4 concrete supports along the direction of the line, and the distance between adjacent monitoring sections is about 36m

This monitoring is for the construction period, and guidance will be provided based on the monitoring data to ensure safe construction on site.

 

  • Implement Function
  • Monitor during the construction process, timely grasp the dynamic changes of the support system and surrounding environment, analyze safety and stability, and use the information obtained from monitoring to guide construction through dynamic information management, making the construction process scientific and information-based.

  • According to the monitoring results, timely detect the warning signs of danger, analyze the reasons, judge the safety of the project, take necessary engineering measures, and prevent engineering damage accidents and environmental accidents from occurring.
  • Compare the on-site measured values with the theoretical predicted values, determine the difference between the actual stress state of the structure and the design calculation, achieve control and optimization of the next construction process, and evaluate the actual bearing capacity of the enclosure structure.

4、 Evaluate the technical condition of the project, verify the correctness of design parameters and design theories.

5、 Strengthen the monitoring of major safety and quality issues by the construction party.


Copyright © 2026 All Rights Reserved 版权所有· 江西飞尚科技有限公司      备案号:赣ICP备13000994号-1     许可证编号:赣B2-20230512