首页 > A Certain Iron Ore Warehouse In Anhui Province
相关项目
相关产品
A Certain Iron Ore Warehouse In Anhui Province
A Certain Iron Ore Warehouse In Anhui Province
Firstly, through on-site investigation of the tailings pond, the purpose is to determine the composition, compactness, and sedimentation laws of the tailings pile, the physical and mechanical properties of the tailings pile, the location of the infiltration line during the investigation, and the possible leakage paths between the dam and the reservoir area, in order to obtain geological profiles for the analysis of dam deformation and stability and reinforcement plans. According to the survey results, the online monitoring system of freesun Tailings Pond adopts 4-point GPS to measure surface displacement, 3 sets of fixed inclinometers to measure internal displacement, 18 point osmometers to measure infiltration line, 2 point ball machine to measure whole pond inspection, 1 point gun to measure flood discharge pool, 4 point radar to measure dry beach, 1 point radar to measure reservoir water level, and 1 point gun to measure overflow tower for this tailings pond. The monitoring room is located in the mining department, with communication using optical cables and a three-level lightning protection design.
         

  On site measurement point layout

          Our company's online safety monitoring system for tailings ponds can help owners achieve the following functions by monitoring the infiltration line, reservoir water level, dam displacement, rainfall, dry beach, video and other contents as a whole:
              1.  The system monitors the infiltration line and water level changes of the tailings pond in real time, automatically calculates the safety superelevation of the tailings pond, transmits monitoring data in a timely manner, and reminds owners to prevent the danger of dam collapse caused by excessive water level in the pond;
              2.  The system automatically calculates the dry beach length of the tailings pond and displays the value on the duty host;
              3.  The system monitors the real-time settlement and horizontal displacement changes of the tailings dam body, automatically generates reports, and allows owners to understand the settlement and horizontal displacement changes of the dam body;
              4.  When the water level safety of the tailings pond exceeds the allowable range, the position of the infiltration line, the minimum dry beach length and other parameters exceed the allowable range, the on duty host sends an alarm message to remind the on duty personnel;
              5.  Remote network management duty personnel can notify tailings pond duty personnel and enterprise tailings pond management personnel of dangerous situations through mobile SMS platform and telephone;
              6.  Tailings pond management personnel can obtain real-time parameters and information of the tailings pond by logging into the tailings pond automated safety monitoring system management website;
              7.  Real time graded alarm function can be implemented to promptly remind owners and various levels of supervisory departments of the safe operation of tailings ponds.

Copyright © 2026 All Rights Reserved 版权所有· 江西飞尚科技有限公司      备案号:赣ICP备13000994号-1     许可证编号:赣B2-20230512
技术支持:
专属客服
专属微信客服