- ProjectBackground
The ground of a subway station in Qingdao, Shandong is relatively flat, and the roof of the station is covered with soil for about 2.7m-3.5m. The station has four entrances and exits, two reserved entrances and exits, and three sets of wind pavilions. The property development has set up six entrances and exits and five sets of wind pavilions. The station is constructed using the open cut method, and both ends of the stations on the two lines are constructed using the mining method.

- Project Design and Implementation
Project Difficulties
A subway project in Qingdao, Shandong Province is located near the coast, with well-developed rivers in the route area. It has been subjected to long-term seawater erosion and backflow, and some areas of the underground have gradually been hollowed out. There is a risk of collapse during the construction process; Moreover, the project is mostly located in granite geology along the route, and blasting operations are required during the construction process, which may have adverse effects on surrounding buildings.
Solution:
A subway line in Qingdao, Shandong Province, uses freesun automated monitoring methods. Main monitoring contents: horizontal displacement inside the enclosure structure, support axial force, blasting vibration and noise, construction environment noise, etc., comprehensively grasp the safety status of subway construction.
(1) Real time collection, transmission, storage, analysis, and management of all testing components for the automated monitoring of the foundation pit enclosure structure and surrounding important structures, achieving online safety automation monitoring and real-time monitoring of the overall safety status of the project operation;
(2) The system has two modes of response and self reporting, which can automatically perform timed measurements or receive commands for point selection, patrol detection, and timed detection according to the set mode;
(3) The sensor structure connected to the online monitoring system is simple, with few transmission components, easy maintenance, high reliability, and good stability. The system is adaptable to all-weather monitoring under various weather and climate conditions, and has network data communication and remote data communication functions;
(4) Power supply measures can ensure round the clock monitoring of system power supply.
Successful Warning Case:
Data Exception:The cumulative value of inclination measurement data for a subway platform in Qingdao, Shandong exceeds the control value.. The maximum cumulative value is at -9.2 meters, with a cumulative value of 31mm; the cumulative values from -6.3 meters to -15 meters are all greater than 28mm
On site investigation:Check the working conditions near the platform. The excavation depth of the foundation pit near the CX05 pipe on site is about 15 meters (from the crown beam to the excavation site), and cracks have appeared on the road south of the foundation pit..

Call the person in charge of the work area to explain the situation, and go to the site with the person in charge to understand the situation and inspect the cracks on the south side of the road surface. Explain the abnormal data situation in detail to the person in charge.
Handling measures:Together with the leaders of the subway group, the construction party, and third-party manual monitoring, we went to the site to understand the detailed situation and introduced in detail the situation reflected by our data.. The construction party's response is that there is a significant deformation issue near CX05, and it is necessary to perform anchor cable tensioning at this location and install a second layer of steel support to ensure the stability of the foundation pit.

ThreeImplement Functions
(1) Can achieve remote automated monitoring without the need for personnel to enter the construction site multiple times;
(2) The system achieves wireless transmission without the need for long-distance cables or optical cables;
(3) Implement information-based management of test data, where relevant personnel can log in to Ethernet with different permissions or use their mobile phones to obtain on-site structural safety data and safety assessment information;
(4) By obtaining rich data on load effects through sensors, analyzing the system, and comparing it with the calculated results, the actual state change and development trend of the structure can be obtained, and the safety status of the double structure can be understood;
(5) When there is abnormal information in the structure, the system automatically issues a warning and promptly conveys the information to relevant management personnel through SMS, and prompts the backend to conduct a safety assessment of the current state of the structure in a timely manner.
Project Value:
- The first city in China to adopt an automated safety monitoring project for the entire subway line. Automated monitoring of blasting vibration speed, noise, poor geological conditions of foundation pits, risk sources, and other structures during the construction process.
- Platform based management allows for a clear understanding of the situation at each site.
- From the construction period to the operation period, ensure the stable and safe operation of the subway in the long term.
- Realize data interconnection and interoperability with relevant departments to meet permission management functions.