The tailings pond is a valley type tailings pond. The initial dam is a permeable rock fill dam with a height of 19m, a crest width of 3.5m, and an outer slope ratio of 1: 1.79. The tailings accumulation dam is 76m high, with a total dam height of 95m and a total storage capacity of 184.743 times; 104m3. The effective storage capacity is 129.32× 104m3, It can meet the 21.62 year tailings demand of a 300t/d molybdenum beneficiation plant.
The flood discharge and drainage system is composed of drainage wells; Composition of drainage tunnels.
2. Monitoring content
Foundation pit monitoring project and content
| Serial Number | Monitoring Objectives | MonitoringInstruments |
| 1 | Surface displacement of dam body | Total Station Online Monitoring System |
| 2 | Internal displacement monitoring of dam body | Introduction type fixed inclinometer |
| 3 | Infiltration line monitoring | Osmotic pressure gauge |
| 4 | Tailings pond water level | Input type water level gauge |
| 5 | Rainfall amount | Rain gauge |
| 6 | Gantan Monitoring | High frequency radar level gauge monitoring |
| 7 | Tailings pond video surveillance | Spherical camera with infrared night vision function |
III. Monitoring significance
(1) The safety monitoring of tailings ponds is of great significance for strengthening the safety supervision of tailings ponds, grasping the safety status of tailings ponds, and improving the safety defense of tailings ponds.
(2) The online monitoring system of tailings pond with the characteristics of informatization, real-time and networking can timely and intuitively grasp the actual dynamics of the dam body, conduct safety evaluation, early warning and forecasting. Provide strong support for the safety monitoring and management decision-making of tailings dams.









