1.  Project Overview
The civil construction of section 05 of the municipal supporting project of Zhengzhou Metro Line 6, Jinma Road Station, is an underground two-story island station with a platform width of 11m and a single column double span box frame structure. The center mileage of the station is DK12+785.000, and the roof cover of the standard section of the station is 2.8-4.0m, with a section width of 20.10m and a burial depth of 16.41-17.61m. The roof cover of the shield tunnel section is about 4.2m (small mileage end) and 2.75m (large mileage end), with a section width of 24.0m and a burial depth of 18.98m (small mileage end) and 18.2m (large mileage end). The total length of the station is 228.700m. The station has four entrances and exits. 1 safety exit, 2 sets of wind pavilions. Both ends of the station are constructed using shield tunneling method. According to the planning requirements of the entire shield tunneling section project, a shield launching shaft will be set up at the southern end of the station, and a shield receiving shaft will be set up at the northern end.
Jinma Station Elevation
 
Jinma Station Longitudinal Section
 
2.  Monitoring content
Monitoring itemsEquipment nameMonitoring purpose
Displacement monitoringDisplacement sensorUsing displacement sensors to measure settlement
Pole axial force monitoringWeighing sensorMonitor the axial force of the structure through an axial force meter
Monitoring of rod inclination angleInclinometer (node)Real time monitoring of the tilt of the bracket
III.  Monitoring significance
(1) Automatic monitoring:It can real-time monitor various measured parameters such as template settlement, pole axial force, and horizontal pole inclination angle.. Alarm thresholds for each parameter can be set according to the design. Mainly monitor the settlement of formwork, axial force of uprights, inclination angle of members, stress, etc. at key positions of segmented construction, and establish online monitoring of high support formworkTest the system and promptly understand the parameters of key structures. Timely grasp the safety status of high formwork; When the relevant data exceeds the limit, timely warning shouldbe given and relevant measures should be taken to ensure construction safety;
(2) On site alarm:Equipped with an alarm, it automatically alarms when the monitoring value exceeds the threshold, supporting multiple alarm methods such as on-site sound and light alarm, SMS alarm, etc. To provide timely feedback on warning information to the greatest extent possible, sound and light alarms are installed on site, and the system platform has multi-dimensional alarm channels to prevent the omission of alarm information.
(3) Data display:Real time data is recorded throughout the entire process, and data changes are dynamically displayed through methods such as curve graphs. Historical records can be traced.. The system collects, stores, and analyzes monitoring data to guide construction, improve the level of high formwork design, and enhance safety and reliability. Data analysis can be presented through methods such as curve charts, and historical data and alarm information can also be queried.
In addition, the system provides the most accurate information on the key structural response parameters and construction loads of high formwork, verifying the rationality of the design of the high formwork support system and providing certain data references for promoting the establishment of high formwork monitoring standards.
In addition to the above functions, rapid replication and integrated supervision can be achieved through system construction:
(1) Reproducibility module
Based on different construction site conditions, modularize and classify monitoring sub items, unify data processing formats, data transmission protocols, and system architecture, achieve replicable operations, and provide practical and feasible operation methods for large-scale promotion and use.
(2) Integration of Collection, Analysis, and Supervision
The monitoring system is fully automated and operates continuously, covering various periods of the construction process. It collects, analyzes, and runs synchronously, and real-time monitoring data is connected to the computer. Through the integration and analysis of a large amount of data, existing structural defects and quality degradation are identified in a timely manner, and their possible development trends and potential threats to structural safety are evaluated to ensure the safe operation of high formwork.
 
 