What Are The Handover And Acceptance Work For Roadbed Small Bridge And Culvert Engineering?
What Are The Handover And Acceptance Work For Roadbed Small Bridge And Culvert Engineering?

1、 After the handover conditions are met for the roadbed small bridge and culvert project, an application must be submitted before acceptance can be carried out. The submitting party (construction unit) should submit an acceptance application to the Director's Office. After the Director's Office approves the application, it should be reported to the Project Office and relevant parties should be organized for joint handover.

2、 The roadbed, small bridge and culvert projects that apply for handover must meet the following conditions: (1) the finished project meets the requirements of the design drawings, the quality is qualified, the on-site organization is completed, a list of remaining issues is made, and the completion time limit is indicated; (2) The quality inspection data signed by the supervising engineer is complete, authentic, and valid; (3) A third-party testing institution with legal testing qualifications (commissioned by the project office) has issued a quality testing report; (4) Completion certificate for segmented acceptance.

3. What are the participating units for the handover and acceptance of roadbed small bridge and culvert projects. (Transportation Quality Supervision Station); The owner (project office), supervisor, construction unit, pavement engineering construction unit, and testing and inspection unit of the roadbed small bridge and culvert project.

4、 During the handover and acceptance of roadbed small bridge and culvert projects, in addition to following the quality inspection and evaluation standards, attention should also be paid to the following items: (1) inspecting the appearance quality of the entire field line; (2) Review outstanding projects; (3) Key sampling items; (4) View relevant information in the office.

5. How to hand over after handover and acceptance: After verifying the conclusion of the handover and acceptance without objection, representatives from all parties shall sign and confirm on the project handover certificate. At the same time, the responsibility for the protection and management of the handover project will be borne by the subsequent road construction unit.